Iman Academy

Houston, TX

Project Description

Iman Academy involved the adaptive re – use of a two – story, 25,484 sq. ft. Chase Bank building, converting it into a fully functional middle school. The project required extensive interior demolition, construction of a science lab and new restrooms, and upgrades to electrical, mechanical, and plumbing systems to meet the requirements of a school occupancy. A phased construction approach was implemented to comply with County Flood Co ntrol regulations without elevating the existing structure. Fire safety compliance was achieved by dividing the building into multiple fire areas with 2 – hour barriers, eliminating the need for a sprinkler system. Structural upgrades were carried out to sup port the installation of a new HVAC system, and accessibility requirements were fully addressed. The school successfully opened on schedule in August 2020.

Masjid Al Mustafa

Houston, TX

Project Description

Masjid Al Mustafa is a 14,000 sq. ft., two-story mosque designed to serve the community with functional, welcoming, and aesthetically cohesive spaces. The work included the completion of architectural design for both the building envelope and interior spaces, ensuring code compliance, accessibility, and integration of mechanical, electrical, and plumbing systems. Permitting and coordination with regulatory authorities were also completed, successfully bringing the project to full completion. The mosque provides a modern, flexible environment for worship and community gatherings while maintaining harmony with its surrounding context.